Norman — Rehab & Make-Ready

Full rehab · unit turn · Full interior rehab of severely distressed unoccupied unit plus common areas

Norman Ave, Dayton · Nov 2025 · November 2025

Overview

Unoccupied unit in severe condition — walls covered in fecal matter, almost everything needing replacement. Full interior rehab and common area refresh.

The work

The unit was in horrific condition prior to work start. The walls were covered in fecal matter, almost everything needed to be replaced, and the common areas needed substantial work throughout. A complete interior rehab was the only path forward.

  • Full interior repair & repaint (plaster repairs, joint cracks, full unit paint)
  • Heating, safety, & mechanical updates (baseboard heaters, smoke detectors)
  • Door and hardware replacements (entry doors, interior doors, balcony hardware)
  • Bathroom repairs & refinishing (tub caulk/reglaze, fixtures, minor plumbing)
  • Kitchen repairs & upgrades (cabinet bases, pulls, light fixture, floor repair)
  • Window protection & exterior sealing (aluminum wrap on existing vinyl windows)
  • Laundry installation (new washer boxes, plumbing, supplied machines)
  • Common-area repairs, painting, & refresh (lighting, stairways, steps, handrails, deep clean)

Project, in plain numbers

  • Type Full rehab · unit turn
  • Where Norman Ave, Dayton · Nov 2025
  • Scope Full interior rehab of severely distressed unoccupied unit plus common areas
  • Timeline November 2025
  • Outcome $21,890 total